[1]
Литвиненко, О.Є. 2010. The algorithm for determining the sequence of movement of electrical crews to construction sites. Problems of Informatization and Management. 2, 30 (Oct. 2010), 119–122. DOI:https://doi.org/10.18372/2073-4751.2.7653.